← All projects

CASE STUDY / NASA L'SPACE ACADEMY / TEAM 36

EXPISCOR.

Enceladus exploration mission concept · 2020

Turning a scientific ambition into an integrated spacecraft concept through interdisciplinary leadership, engineering trade-offs, and planetary data analysis.

Project Manager & Team LeadComputer EngineeringPreliminary Design Review
77 kgMISSION MASS LIMIT
51 × 51 × 76CM / DESIGN ENVELOPE
322 mphAVERAGE PLUME-PARTICLE LAUNCH SPEED
InsufficientSOLAR CAPACITY

The project in plain language

No engineering background needed.

01

The goal

Plan how a small spacecraft might land on Enceladus, an icy moon of Saturn, and investigate its environment.

02

How it works

I led a team that brought together the mission goals and engineering constraints. I studied terrain maps to help choose a landing region and took on computer-aided spacecraft design when the team needed it.

03

What was achieved

We delivered a mission design report with proposed spacecraft systems, drawings, and landing-site analysis. It was an educational design study; no spacecraft was built or launched.

01 / LEADERSHIP

Lead the system, not just the task.

  • Project roleProject Manager & Team Lead.
  • Mission
    • Lead an interdisciplinary team through NASA's L'SPACE Academy.
    • Develop a lander concept designed for Enceladus's extreme conditions.
  • Adopted technical responsibilities
    • Survey candidate landing regions in JMARS.
    • Assess terrain profiles and proximity to south polar plume sites.
    • Take on spacecraft systems design to keep PDR work progressing.
    • Develop spacecraft CAD assemblies and engineering drawings.
    • Design thruster placement, document the propulsion rationale, and fit the configuration within mission mass and volume constraints.

02 / ENGINEERING DECISIONS

Managing mission uncertainty.

Mission decisions balanced terrain data, environmental unknowns, mission needs, and available resources.

01 / SYSTEM TRADE-OFFPlume-site proximity

Screen for proximity to south polar plume sites while accounting for uncertain terrain and local conditions.

02 / SYSTEM TRADE-OFFTerrain and landing assumptions

Compare slope profiles and usable area with preliminary lander constraints.

03 / SYSTEM TRADE-OFFMission scope and resources

Shape the rover concept into a stationary lander with separate propulsion for the PDR.

03 / PLANETARY ANALYSIS · JMARS

Surveying Enceladus's plume terrain.

I used JMARS (Java Mission-planning and Analysis for Remote Sensing) to survey candidate Enceladus landing terrain and screen for a suitable region near the south polar plume sites. I compared terrain profiles and site characteristics to inform the proposed landing zone. This was preliminary mission analysis, not a flight-ready site certification.

LANDING-SITE SCREENINGSouth polar tiger-stripe region / conceptual study15 × 8 kmPlume proximityRelief hazardsCandidate regionExcluded areas
Interpretive schematic based on the terrain screening documented in the 2020 EXPISCOR PDR, pp. 51–53. Not an original JMARS image or a reconstruction of measured topographic contours.
10–40°REPORTED SLOPE RANGE
23.6°REPORTED AVERAGE SLOPE
~10 kmESTIMATED DISTANCE TO NEAREST PLUME

From terrain analysis to engineering decisions

01 / ANALYSISEvaluate terrain

Compare elevation variation, slope profiles, and landing-area dimensions.

02 / ANALYSISScreen hazards

Identify abrupt elevation changes and steep approaches that elevate touchdown risk.

03 / ANALYSISPreserve science access

Balance terrain screening against the need to study active plumes.

04 / ANALYSISInform engineering

Connect site characteristics with leg articulation, descent strategy, and payload siting.

The PDR proposed landing-leg tolerance for slopes up to 45°. That is a design target, not a verified physical capability. JMARS screening supported a proposed site; it did not establish a flight-certified landing zone.

04 / DELIVERABLES & REFLECTION

Integrated thinking. Documented decisions.

Team deliverables

Preliminary Design Review, mission architecture, spacecraft CAD assemblies and engineering drawings, propulsion and landing concepts, payload integration, and proposed verification and risk approaches.

Personal deliverables & responsibilities

JMARS landing-site investigation; spacecraft CAD design and documentation; and Project Manager / Team Lead responsibilities spanning cross-disciplinary coordination and prioritization under resource constraints.

EXPISCOR was an educational mission concept developed through NASA L'SPACE Academy, not a flown or flight-qualified NASA spacecraft. Production, testing, launch, and surface operations were not demonstrated.